The overall aim is to address climate change at a Community level through decarbonising the Tamfourhill Community Hub by installing a sustainable and renewable energy system , in line with the recommendations contained within the  Energy Audit carried out by Business Energy Scotland.  This will be achieved through:

 

The installation of a 24kW air to water source heatpump system.

Installing 10 kWp roof mounted solar PV system.

A 5-kWh battery storage system.


Energy Efficient measures including - LED lightingcavity wall insulationloft  insulation, draft proofing and heating controls.